-
Enw'r Prosiect:Qatar - Doha Metro Green Line o dan y ddaear.
Contractwr:Grŵp Saudi Bin Ladin a Menter ar y Cyd HBK, (PSH-JV).
Eitemau a Gyflenwyd:PIBELL DUR ERW (DN150 ~ DN600MM, ASTM A53 GR.B).
Cwty:1500 tunnell.
-
Enw'r Prosiect:Piblinell nwy cludo NO.2 i Dwrci.
Contractwr:RHANBARTH TECNOFORGE.
Eitemau a Gyflenwyd:API PIBELL DUR LSAW 5L X65 PSL2 1016*10.31 1016*12.7 1016*15.87.
Cwty:5000 tunnell.
-
Enw'r Prosiect:Prosiect Adeiladu Dinas.
Contractwr:Eurl Generale Hydro Ouest.
Eitemau a Gyflenwyd:Pibell Dur Ssaw (DN400 ~ DN500MM, API 5L GR.B);Pibell Dur Di-dor (DN8 ~ DN400MM, API 5L GR.B);Pibell Dur Lsaw (DN600MM, ASTM A252 GR.3).
Cwty:1500 tunnell.
-
Enw'r Prosiect:Gwaith Ynni Dŵr Mini Ranawala.
Contractwr:JB Power (PVT) Ltd.
Eitemau a Gyflenwyd:PIBELL DUR SSAW (DN600 ~ DN2200MM, API 5L GR.B); PIBELL DUR di-dor (DN150 ~ DN250MM, API 5L GR.B).
Cwty:2100 tunnell