Gwneuthurwr Pibellau Dur Arwain a Chyflenwr Yn Tsieina |

Achos Peirianneg

  • Qatar - Doha Metro Green Line Underground

    Qatar - Doha Metro Green Line Underground

    Enw'r Prosiect:Qatar - Doha Metro Green Line o dan y ddaear.
    Contractwr:Grŵp Saudi Bin Ladin a Menter ar y Cyd HBK, (PSH-JV).
    Eitemau a Gyflenwyd:PIBELL DUR ERW (DN150 ~ DN600MM, ASTM A53 GR.B).
    Cwty:1500 tunnell.
  • Piblinell nwy cludo NO.2 i Dwrci

    Piblinell nwy cludo NO.2 i Dwrci

    Enw'r Prosiect:Piblinell nwy cludo NO.2 i Dwrci.
    Contractwr:RHANBARTH TECNOFORGE.
    Eitemau a Gyflenwyd:API PIBELL DUR LSAW 5L X65 PSL2 1016*10.31 1016*12.7 1016*15.87.
    Cwty:5000 tunnell.
  • Prosiect Adeiladu Dinas

    Prosiect Adeiladu Dinas

    Enw'r Prosiect:Prosiect Adeiladu Dinas.
    Contractwr:Eurl Generale Hydro Ouest.
    Eitemau a Gyflenwyd:Pibell Dur Ssaw (DN400 ~ DN500MM, API 5L GR.B);Pibell Dur Di-dor (DN8 ~ DN400MM, API 5L GR.B);Pibell Dur Lsaw (DN600MM, ASTM A252 GR.3).
    Cwty:1500 tunnell.
  • Gwaith Ynni Dŵr Mini Ranawala

    Gwaith Ynni Dŵr Mini Ranawala

    Enw'r Prosiect:Gwaith Ynni Dŵr Mini Ranawala.
    Contractwr:JB Power (PVT) Ltd.
    Eitemau a Gyflenwyd:PIBELL DUR SSAW (DN600 ~ DN2200MM, API 5L GR.B); PIBELL DUR di-dor (DN150 ~ DN250MM, API 5L GR.B).
    Cwty:2100 tunnell