Project Name: Qatar -Doha Metro Green Line underground.
Contractor: Saudi Bin Ladin Group and HBK Joint Venture, (PSH-JV).
Items Supplied: ERW STEEL PIPE (DN150~DN600MM, ASTM A53 GR.B).
Qty: 1500tons.
-
Project Name: Transit gas pipline NO.2 to Turkey.
Contractor: TECNOFORGE DIVISION.
Items Supplied: LSAW STEEL PIPE API 5L X65 PSL2 1016*10.31 1016*12.7 1016*15.87.
Qty: 5000tons.
-
Project Name: City Construction Project.
Contractor: Eurl Generale Hydro Ouest.
Items Supplied: Ssaw Steel Pipe(DN400~DN500MM, API 5L GR.B); Seamless Steel Pipe(DN8~DN400MM ,API 5L GR.B); Lsaw Steel Pipe(DN600MM ,ASTM A252 GR.3).
Qty: 1500tons.
-
Project Name: Ranawala Mini Hydropower Plant.
Contractor: J.B Power (PVT) Ltd.
Items Supplied: SSAW STEEL PIPE(DN600~DN2200MM, API 5L GR.B);SEAMLESS STEEL PIPE(DN150~DN250MM, API 5L GR.B).
Qty: 2100tons