-
Ngaran proyék:Qatar-Doha Metro Green Line bawah tanah.
Kontraktor:Saudi Bin Ladin Group sareng HBK Joint Venture, (PSH-JV).
Barang anu disayogikeun:Pipa baja ERW (DN150 ~ DN600MM, ASTM A53 GR.B).
Jumlah:1500 ton.
-
Ngaran proyék:Transit pipa gas NO.2 ka Turki.
Kontraktor:DIVISI TECNOFORGE.
Barang anu disayogikeun:LSAW STEEL API 5L X65 PSL2 1016 * 10,31 1016 * 12,7 1016 * 15,87.
Jumlah:5000 ton.
-
Ngaran proyék:Proyék Pangwangunan Kota.
Kontraktor:Eurl Generale Hydro Ouest.
Barang anu disayogikeun:Pipa Baja Ssaw(DN400~DN500MM, API 5L GR.B);Pipa Steel Seamless (DN8 ~ DN400MM, API 5L GR.B);Lsaw Steel Pipe (DN600MM, ASTM A252 GR.3).
Jumlah:1500 ton.
-
Ngaran proyék:PLTA Mini Ranawala.
Kontraktor:JB Power (PVT) Ltd.
Barang anu disayogikeun:Pipa baja SSAW(DN600~DN2200MM, API 5L GR.B);PIPE BAJA SEAMLESS(DN150~DN250MM, API 5L GR.B).
Jumlah:2100 ton